bg
Engul

Energy center Art-Tech Krasnodar

Location of the realisation: Krasnodar (Russian Federation)
 
Date of the realisation: 2019-2021
 
Total power: 3х2000 kWe
 
The Engul company participated in the construction of the energy center for power supply and backup of the logistics park and the data center. The company manufactured and delivered a cogeneration unit with an output of 2,000 kWe for the energy center. The energy center consists of three cogeneration units with a total output of 6000 kWe.
 
The control system supplied by Engul ensures the cooperation of all three cogeneration units with the distribution network and at the same time fulfills the requirements of the Grid code.
 
The energy center at full electrical output is able to simultaneously supply thermal energy with an output of 3x 1982 kWt.

Location of the realisation
Krasnodar (Russian Federation)


Date of the realisation
2019-2021


Total power
3x2000 kWe

Back to all references

Announcement for offers

Sorry, this entry is only available in Slovak and Russian.

read more

Engul received a grant

Engul, s. r. o. has received a grant of EUR 141,899.83 from the Research and Innovation Program (OPVaI-MH/DP/2016/3.3.1-04) of the Ministry of Education, Science, Research and Sport of the Slovak Republic, represented by the Ministry of Economy of the Slovak Republic, co-funded by the European Fund regional development. The strategic goal of the project to […]

read more