Thermal Park Bešeňová – CHP units engul 1500 GACI

3x generating set – combustion engine MWM, generator MARELLI

– electricity production 3x 1200 kWe, 400 V / 50 Hz, parallel operation with the mains

– heat production 3x 1 184 kWt

– fuel – natural gas

Each CHP unit engul 1500 GACI is installed in separate container. On the roof of the container, there are installed exhaust gas silencers, dry-coolers and air inlet and outlet systems. Inside of container, there are installed generating set with thermal block, which part is also exhaust gas exchanger, control panel and switch gear of output electric power from CHP unit.

Місце реалізації
Bešeňová


Дата реалізації
2010


Загальна потужність
3x 1200 kWe, 3x 1 184 kWt

Назад до всіх проектів